Contact Us
TEL: +86-576-81108366
Mobile: +86-13362691788
E-mail: rolly@enamould.com
Address: No.6 Chaoyuan Rd, Industrial North, Huangyan, Taizhou, Zhejiang

Turnover Box Mould

Brief description of turnover box mould: 1.mold base:45# 2.core/cavity:S136/718H/P20 3.runner type: hot runner 4.delivery time: 35 days 1.The series of crate mould we have made ENA MOULD is specialize in all kinds of crate and box mould; 2.Detailed description of the Crate Mould: Basic mould...

Brief description of turnover box mould:

1.mold base:45#  

2.core/cavity:S136/718H/P20

3.runner type: hot runner

4.delivery time: 35 days


1.The series of crate mould we have made

ENA MOULD is specialize in all kinds of crate and box mould;


  

  


2.Detailed description of the Crate Mould:

Basic mould information:

Runner Type

Hot Sprue

Mould Size

950x900x550mm

Mould Weight

3020Kg

No. of Cavity

1 cavity

Product Size

450x350x240mm

Product Material

HDPE

Product Weight

1100g

Wall thickness

1.7mm

Surface finish

polish

Delivery Time

35 days


There are three levels of mould quality for your option.

Option A:  Level A quality (Highest Level Quality)

Mould Base: LKM, 45# Steel

Core/Cavity: S136+Becu

Slider/Insert: S136

Mould spare parts: SKD

Hot Runner: YUDO

Mould Life:1,000,000 shots

Cycle Time:40s


Option B: Level B quality (Middle Level Quality)

Mould Base: S50

Core/Cavity: 718H

Slider/Insert: 718H

Mould spare parts: Jinghong, China

Hot Runner: YUDO,China

Mould Life:800,000 shots

Cycle Time:55s


Option C: Level C quality (Lowest Level Quality)

Mould Base: 1045

Core/Cavity: P20

Slider/Insert: P20

Mould spare parts: Jinghong,China

Hot Runner: Hongying,China

Mould Life:5,000,000 shots

Cycle Time:60s


Attention

Price varies in different quality level. When you send us the mould inquiry, please offer the following information:

1) Quality level you choose: Level A/Level B/Level C

2) Crate Photo

3) Crate Dimension: L*W*H


3. Crate Mould Making Process

Processing

Time

Prepare Steel

5 days

CNC Machining

10 days

Precision CNC Machining

5 days

Drill

5 days

Polishing

3 days

Assembling and Fitting

5 days

T1 mould test

2 days

Total: It is 35 days for first mould testing after mold design is confirmed.


3.1 DESIGN STAGE3.2 MACHINING STAGE


  6(001).jpg


3.3 Mould Testing

  8(001).jpg


4. Crate Mould Quality Control

For the Q/C of mould, there are 3 steps:

1.Mould Material Q/C

- Mould Steel Checking(Hardness, flaw detection)

- Mould Standard Spare Parts Checking(hardness, size, flaw checking)

2. Mould Making Process Q/C 

- design checking (part design, mould design, mould engineering drawing)

- Each part of mould’s size checking after machining according to 2D drawing

- mould testing(check mould running condition)

3.check with customer’s requirement again before mould shipping.


5.Crate Mould Pack and Shipping

Anti-rust oil is painted first, then Plastic film, and finally Wooden Case.

Sent together with the mould:

a)Mould manual instruction

b)engineering drawing in flash disk

c)one more set of mould spare parts: heater, ejector pin, bush, water nozzle, water pipe, hanging ring.


6. Crate Mould Maintenance

a) When the mould is vacant, spray the anti-rust oil

b) To clean the gate and cooling system regularly

c) Avoid to use recycled material if the mould is suitable for virgin material only


7. After-Sale Service

a) Engineering and one interpreter can be sent to customer’s factory for first running.

b) one-year after-sale technique support


Hot Tags: turnover box mould, China, manufacturer, suppliers, factory, price, quotation, buy
Inquiry