Contact Us
TEL: +86-576-81108366
Mobile: +86-13362691788
E-mail: rolly@enamould.com
Address: No.6 Chaoyuan Rd, Industrial North, Huangyan, Taizhou, Zhejiang

Plastic Garbage Bin Mould

Brief description of Plastic Garbage Bin Mould: 1.Mold base:45# Core/cavity: 718H/P20 2.Runner type: hot runner 3.Delivery time: 55 days 1.Garbage bin mould we have made ENA Mould is specialize in crate mould, pallet mould, paint bucket mould, food container mould, flower pot mould and garbage...

Brief description of Plastic Garbage Bin Mould:

1.Mold base:45#  Core/cavity: 718H/P20

2.Runner type: hot runner

3.Delivery time: 55 days


1.Garbage bin mould we have made

ENA Mould is specialize in crate mould, pallet mould, paint bucket mould, food container mould, flower pot mould and garbage bin mould. For the detailed of the company information, please view our ‘’company profile’’. You will get a completed view of this company.

 2(001).jpg

  4(001).jpg



2.Detailed description of the Garbage bin Mould:

Basic mould information:

Runner Type

Cold Runner

Mould Size

According to request

Mould Weight

TBD

No. of Cavity

1 cavity

Product Size

60L / 120L / 240L / 660L

Product Material

PP

Product Weight

According to capacity

Surface finish

Polish / texture

Delivery Time

55 days


Mould Base: 45# Steel,self-made

Core/Cavity: P20

Slider/Insert: P20

Mould spare parts: Jinghong,China

Hot Runner: Hongying,China

Mould Life:500,000 shots

Cycle Time:75s


Attention:

Price varies in different quality level. When you send us the mould inquiry, please offer the following information:

1) Quality level you prefer ?

2) Garbage bin Photo

3) Garbage bin Dimension: L*W*H

4) Garbage bin capacity:* L


3. Garbage bin Mould Making Process

Processing

Time

Prepare Steel

8 days

CNC Machining

13 days

Precision CNC Machining

15 days

Drill

5 days

Polishing

7days

Assembling and Fitting

5 days

T1 mould test

2 days

Total: It is 55 days for first mould testing after mold design is confirmed.


3.1 DESIGN STAGE


  6.jpg


3.2 Mould Testing 


4. Injection Dustbin Mould Quality Control

For the Q/C of mould, there are 3 steps:

1.Mould Material Q/C

- Mould Steel Checking(Hardness, flaw detection)

- Mould Standard Spare Parts Checking(hardness, size, flaw checking)

2. Mould Making Process Q/C 

- Design checking (part design, mould design, mould engineering drawing)

- Each part of mould’s size checking after machining according to 2D drawing

- Mould testing(check mould running condition)

3.check with customer’s requirement again before mould shipping.


5.Injection Dustbin Mould Pack and Shipping

Anti-rust oil is painted first, then Plastic film, and finally Wooden Case.

Sent together with the mould:

a)Mould manual instruction

b)Engineering drawing in flash disk

c)One more set of mould spare parts: heater, ejector pin, bush, water nozzle, water pipe, hanging ring.


6. Injection Dustbin Mould Maintenance

a) When the mould is vacant, spray the anti-rust oil

b) To clean the gate and cooling system regularly

c) Avoid to use recycled material if the mould is suitable for virgin material only


7. After-Sale Service

a) If you are located in India, you can contact our Indian maintenance shop in Delhi. 

b) Engineering and one interpreter can be sent to customer’s factory for first running.

c) One-year after-sale technique support


8.Contact Information

Miss Wu

Whatsapp: +86-13291678103




Hot Tags: plastic garbage bin mould, China, manufacturer, suppliers, factory, price, quotation, buy
Inquiry